Daily Sewing Line Target Or Capacity Calculator
Explanation of Formula
What Is Line Target or Capacity?
Garments Sewing Line Capacity or Target refers to the expected or planned production output of a sewing line in a garment manufacturing facility over a specific period
- Manpower: This is the number of workers involved in the sewing line.
- Working Hours: The total number of hours worked during the sewing line.
- Target Efficiency: Target Efficiency is the desired level of productivity set for operators or production lines.
- SMV (Standard Minute Value): This is the standard time allowed for an operation to be completed by an average skilled operator. In your formula, it’s referred to as Garments SMV (Minutes).